Project Description
This project focused on modernizing camp utilities through renewable energy integration. Nangaka was tasked with improving hot water availability while reducing dependence on traditional fuel sources and lowering operational costs.
The installation required careful connection to existing infrastructure and optimization for reliability, ensuring residents benefited from consistent service regardless of environmental conditions.
Challenges
- Reducing fuel consumption and running costs
- Integrating with existing water networks
- Guaranteeing consistent heating performance
- Operating in remote climatic conditions
- Minimizing disruption during upgrades
Outcome
The client achieved improved comfort levels, greater sustainability, and measurable efficiency gains across camp operations.
Call to Action
Ready to modernize your utilities? Let Nangaka design energy-smart camp solutions.



